From: route@monster.com
Sent: Thursday, April 07, 2016 11:55 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Maria G. Vega Project Planner/
Scheduler
Address:
3027 Lake Dr, Katy, TX 77494. Phone number: (832) 829-0100 Email:
mariagabriela.vega@gmail.com Summary · Engineer with 10 years of experience and solid knowledge
in project planning, scheduling, project control, cost control, contract
administration, and budgeting in the Oil & Gas Industry. · Experienced user of Primavera P6 software as well as
Microsoft Project, Access, SAP, AutoCAD, PAS v5 –ACPA, IP3, Lulowin. · Microsoft Windows and Office advanced user. · Communications skills include fluency in English and
Spanish. · Lawful permanent resident of the United States Objectives Obtain a position where I can implement my
experience and education in a challenging and rewarding position utilizing
both my technical and analytic abilities. Professional
Experience
Senior Scheduler Technip - Dec 2013 -
Actual Houston
- Texas Manage project
planning and control of BP Mad Dog Surf and Export Select Definition Phase,
BP Thunder Horse South Expansion Select Phase, BP Mad Dog Surf and Export
Define Phase and CNOOC Liuhua 16-22/ Liuhua 11-1 Joint Development Project
(FEED): ·
Building
Project Schedules, S Curves, Progress Measurement System setup (Janus and
Sezame). ·
Monitoring
and Control of activities, Schedule and Progress Curve updates, Forecast
review/updates as well Earned Value and Critical Path (CPM)/ Trend analysis. ·
Assist
project management team in preparation of all Project Controls reports
including but not limited to scheduling updates and analysis, progress
reporting, change management and various reporting for management. ·
Provide
analysis and reporting for special and/or specific Planning and Scheduling
issues. ·
Work directly
with the Project Manager and Project team members to identify and resolve
problems in the area of Planning and Scheduling. ·
Interfaces
with project shareholders. ·
Review and
ensures communication of project related information to ensure project
objectives will be executed in a timely manner. Planner/Scheduler
& Control Analyst ONGC Videsh
Limited
- Sept 2011 to Sept 2013 Lecheria -
Venezuela Manage
project planning and control in the project “Carabobo 1” (Development of Oil
Production facilities of 400 KBOPD XHO and Upgrading facilities – feedstock
of 200 KBOPD XHO at blocks Carabobo 1N and Carabobo 1C): ·
Define an
appropriate WBS (work breakdown structure) for projects, and report
deviations to appropriate cost control group and project manager. ·
Building
levels of project schedules, schedule updates, s curves (including
procurement). ·
Monitoring
and control of activities according to Project Schedule (progress curves,
areas of concern and trend analysis). ·
Provide
support of related project scheduling activities including project baseline
schedules, critical path and earned value analysis, project planning and
forecasting, progress validation, performance measurement. ·
Preparing
and analyzing Integrated Project Technical Reports to shareholders (on a
weekly and monthly basis). ·
Presentations
to management related to the Integrated Project activities. ·
Advise
project teams and management concerning the impact of slippages and potential
changes. Implement into the plan. ·
Preparing
Annual Reports, Special Reports and other documents required for the Project.
·
Production
of documents in both Spanish and English language. Project Planner
& Cost Controller INELECTRA - Jun 2008 to Aug
2011 Lecheria -
Venezuela Manage
project planning and cost control in engineering and construction projects –
oil and gas industry (“Professional Services for Detail Engineering of
Superficial Installations in Existing Clusters” – Petrocedeño; “Expansion Metor”
– Complejo Petroquimico Jose Antonio Anzoategui and “Engineering Services for
Superficial Installations” – Petromonagas and PDVSA): ·
Work with
project teams to identify and sequence key construction activities. ·
Create
resource-loaded schedules with key materials and resources. ·
Setting up
the project baseline/ building schedules, updating progress and reporting. ·
Schedule
updates, project progress s curves. ·
Define an
appropriate WBS (work breakdown structure) for projects, and report
deviations to appropriate cost control group and project manager. ·
Project set
up through SAP. ·
Staffing
planning and cost control using SAP. ·
Critical
path (CPM) and earned value analysis. ·
Daily/
Weekly and Monthly Reports regarding physical and financial progress. ·
Manage Pre-invoicing
and invoicing. Invoicing updates/ Financial management reports. Project Engineer Orgar Corporacion - Nov 2005 to May
2008 Lecheria -
Venezuela ·
Project
Planning & Control and Construction Engineer of the following projects:
“Drainage Repair and Demarcation of La Costa Road”; “Construction of the
Jorge R. Ave. Interchange” and “Construction of the Nueva Esparta Avenue
Intersection”; “Costanera Avenue Rehabilitation” and “Highway Maturín –
Mesones. ·
Earth work
supervision of the project “Construction of the Child Foundation Theater”. ·
Earth work
quality control of the project “Construction of Tae Kwon Do Entertainment
Center”. ·
Project
conceptualization and Project Design of “Construction of Santiago Mariño
Avenue”; “Rehabilitation of Agricultural Roadway R 030”; “Rehabilitation of
Santa Fe Crossing Roadway, L003 and “Construction of Neveri River Bridge”. Education: ·
Bachelor of
Science in Civil Engineering.
Universidad Santa Maria – Venezuela, November 2005. Training and
Certifications: · Staffing Plan SAP. Inelectra. May 2011. Duration: 16
Hours. · Mechanic Course for Planners. Inelectra. April 2011.
Duration: 2 Hours. · Contract Administration Course. Pits Solutions. March
2011. Duration: 16 Hours. · Electrical Theoretical Course. Inelectra. March 2011.
Duration: 4 Hours. · Access 2007. Kapacita. November 2009. Duration: 24 Hours. · Project Planning and Control with Primavera P6. Inelectra.
December 2009. Duration 16 Hours. · Project Management Program. Universidad
Metropolitana. May 2008 - July 2008. · Process Theoretical Course. Inelectra. December 2008.
Duration: 8 Hours. · Project Planning and Control with Primavera P6. Advanced
Level. ENIAC. December 2008. Duration: 16 Hours. · Project Planning and Control with Primavera P6. Basic
Level. ENIAC. October 2008. Duration: 24Hours. · SIMVEAS 3er. Venezuelan Asphalt Symposium - EXPOASFALTO
2006. (Sep.2006). · Design and Inspection of Concrete Mixtures. Workshop.
Holcim. August 2005. Duration: 24 Hours. · Basic Course of Rigid Pavements. Holcim. August 2005.
Duration: 24 Hours. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Spanish |
Fluent |
|
|
|